Jump to content
Sign in to follow this  
sundownz

SA-8 v.2 Finalized Parts Thread

Recommended Posts

The finalized frame tool with production finish is done so I'm starting a thread to hold photos of all the parts as they finish up... we should have the rest of the tooled parts done the week of the 24th and the motor likely before that. So as I get images of the final parts I'll put them up!

1_SML.jpg

2_SML.jpg

3_SML.jpg

4_SML.jpg

Share this post


Link to post
Share on other sites

4_SML.jpg

Love the logo in the frame!!

Share this post


Link to post
Share on other sites

Looks pretty nice

Share this post


Link to post
Share on other sites

Figured we wanted people to KNOW this is our frame :drink40:

Wouldn't want spying eyes from a competitor to do the direct copy cat thing! Won't name names .... :peepwall:

That basket looks great and the finish really brings it out!

Share this post


Link to post
Share on other sites

Back and top plate are done -- these are very similar to the "v1.75" unit I sent over to Pulse Car Audio a while back except the pole is 10mm taller.

DSC04712.JPG

DSC04713.JPG

Share this post


Link to post
Share on other sites

Wow very nice! Cannot wait to get a pair of these to play with.

Share this post


Link to post
Share on other sites

New frame looks great! :drink40:

Share this post


Link to post
Share on other sites

Just in last night -- soft parts and spacers are done !!!

cone(1).jpg

* Our surround tooling was modified a bit for the wider surround landing on our new frame. More glue surface area to the frame!

cone(2).jpg

gasket.jpg

* Custom gasket with our logo to fit our new frame.

magnet%20boot.jpg

* Modified magnet boot to fit the revised motor structure

spacer.jpg

* Venting spacer like the big brother SA-10/12/15

spider%20ring.jpg

* Custom tooled ring for our spaced spider setup (notice through bolt holes for the steel bolt-on ring)

top%20spider%20and%20bottom%20spider.jpg

* New custom tooled spider - 10mm wider than before! With DUAL round leads -- we mean business!

-----

Prototypes should be done next week... then we'll have them early next month. Once the prototypes are built up we can get an idea of the final cost on these guys.

Share this post


Link to post
Share on other sites

Very nice looking pieces. I am interested :)

Share this post


Link to post
Share on other sites
Sign in to follow this  

×