OK guys I cracked into grasshopper's pictures and this is what I found that he hasn't posted. I knew more had been done but the pictures havn't shown it. No disrespect, but the story has to be told.... Driveshaft was pulled, and was shortend, balanced, new carrier bearing and u-joints installed. By grasshoper at 2010-10-19 Back in... By grasshoper at 2010-10-19 By grasshoper at 2010-10-19 New trans pan installed... By grasshoper at 2010-10-19 Trans Cooler installed. By grasshoper at 2010-10-19 By grasshoper at 2010-10-19 By grasshoper at 2010-10-19 Have started running the trans lines to the cooler. By grasshoper at 2010-10-19 By grasshoper at 2010-10-19 Getting the plumbing of the cooling system started. By grasshoper at 2010-10-19 By grasshoper at 2010-10-19 By grasshoper at 2010-10-19 Power Steering connected. By grasshoper at 2010-10-19 Have started the plumbing of the fuel system. By grasshoper at 2010-10-19 By grasshoper at 2010-10-19 By grasshoper at 2010-10-19 By grasshoper at 2010-10-19 Thats all I could get you guys for now, we will continue working!