March 1, 201411 yr Author First we'll start with pics of my beastly temp sub. Pure sex. Single 6" port, probably tuned around 33. Moves a good bit of air and is really impressive for a single 12. Next. Making runs of wire for the front stage. 3 run of 12 gauge per door plus 2 runs of 16 gauge. I may not use all of it but it will give me good wiring options. Getting wood with my dude Ryan( no homo.) Getting the base of the superstock build ready. Getting the sides in. Three 18s is going to be tight. Lots fiberglassing will be going down. And another 180$ trip to the hardware store..
March 3, 201411 yr Author I have a long ways to go lol. I attempted to do some more work today. Improvised work bench lol. Then tragedy struck. I was pretty irritated about this. The clip went wherever... It has only been used maybe seven times... Well... After I took the pic, I got more irritated. I got busy working on some sanding.
December 29, 201410 yr Author Any updates? Excited to see the finished product I got in a wreck back in march. So the project is shit canned.
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.