I'm at a stand still on the lowers until I get the ball joint sleeves machined so I moved on to the jig for the upper. The new upper ball joints are larger and longer also. These are also NAPA units Well now I need to get material for the uppers so it's on to narrowing the rearend. Had to do a ton of measuring and remeasuring and get a print drawn up to make sure I didn't end up scrapping $1200 worth of axles and housing. This is my least favorite thing to do.:burn: Removed about 15" from the housing, the drops are sitting on the table. Got some more prep work done on the housing. I didn't like the way it was welded. I don't like the idea of grinding down welds that I didn't do so I ground a groove in all the existing welds and ran a nice fat bead over them to allow me to polish the welds down without risking any thin spots. Then I got busy polished the welds down. I'll do more finish work later after I'm done welding all the brackets on. Had to modify my aligment blocks to fit the Ballistic housing ends since they are a heavy duty end with extra retaining bolts. The raised center section slides into the housing end and gets bolted up to line up the housing ends with each other and the center bearings. An aligment bar slides through the center before welding them on. The ends are a press fit and I just have them press on a little bit for mock up, they aren't squared up yet. You can see the axle tube( marked with white) slides into the ends. This eliminates a butt weld and greatly increases strength. I'll also weld this end as well as around the inboard edge of the housing end.